wholesale custom tracksuits men with digital printing manufacturer | mens tracksuits supplier
- Model
- MY-028
Item specifics
- Color
- custom colors
- Delivery time for bulk order
- 10-30 days after confirming pre-production samples
- FOB port
- Shenzhen or Guangzhou
Review
Description
Item | wholesale custom yellow tracksuits men with digital printing manufacturer | ||
Features | Customize your logo with digital printing on hoodies | ||
Fabric
|
Customize the fabric you like ,cotton or polyester,french terry or fleece etc.
|
||
Colors
|
Customize the color you like,we provide color swatch/color book for option.
|
||
Sizes
|
Customize the size you like,if you don’t have size chart,we can provide size chart for your reference. |
||
Plate making time | 7-15 days | ||
MOQ | 50-100 pieces per color per design | ||
Shipping time | 4-7 days by express like DHL,UPS, FEDEX, TNT. It will spend at least one month by sea to North America and Europe. | ||
Tags&labels&zippers&buttons | we advise to customize the tags,labels, zippers, buttons after you decide to place the bulk order from us, it can help you save time and cost . |
The following points should be noted in custom tracksuits men with digital printing:
1. The design manuscript must be high-definition, with a clarity higher than 300dpi. Pattern color should not be too complicated, it is recommended to use concise design.
2. Choose the right fabric. There are many kinds of printed fabrics, and appropriate fabrics should be selected according to the required styles and occasions, such as sports fabrics, cotton fabrics, etc.
3. The right colors should be chosen. The colors of hoodies and prints should complement each other and harmonize.
4. Size problem, to choose the right size according to the actual demand, and different brands of size may be different, should pay attention to the difference.
5. Reserve enough time for delivery, because custom tracksuits men needs to go through multiple links such as design, sample production, mass production, and transportation time, so we must plan the time in advance.